# Average Time for BOM Product

**URL:** <https://www.dolibarr.org/forum/t/average-time-for-bom-product/20156>\
**Category:** PM modules\
**Tags:** Develop, v12, Issue\
**Created:** [January 25, 2021, 7:48am UTC](https://www.dolibarr.org/forum/t/average-time-for-bom-product/20156 "2021-01-25T07:48:37Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![sraul](https://www.dolibarr.org/forum/letter_avatar_proxy/v4/letter/s/47e85d/32.png) [@sraul](https://www.dolibarr.org/forum/u/sraul)\
**Post date:** [January 25, 2021, 7:48am UTC](https://www.dolibarr.org/forum/t/average-time-for-bom-product/20156/1 "2021-01-25T07:48:38Z")

</div>

Hello, I have a question/favor to ask this community, so for my company I need a new extenstion in module or just a small code if you’d like. To help you better understand my situation I’ll start with an example. EXAMPLE: I have created BOM with a qty **(1)** for an item with all of its raw material included and i set time for production est. **3 min**. And after that i validated my BOM, I created MO. I put all the informations which are needed as well how much qty i need to produce for one batch. After I created my MO i see all the details about my BOM and MO as I wait to validate. So my question is how to show, in MO details how many hours/minute it needs to take to produce “x” qty of included BOM, exp. my BOM qty is 1 and MO qty is 400 to produce , that means that BOM **(1\*3 min)** \* 400 MO / 60 to make an hour, can someone help me with this problem, i need to implement it in MO. Thanks a lot i hope that i made it easier for you to understand my situation. Thanks in advance for all the help!
