Hi.
I want to use Dolibarr to manage a team and assign them to events/jobs. This itself is of course not a problem, but I was wandering if there is a way that the system would warn me if I assign a person to multiple projects, that happen at the same time or if he/she has planned some holidays.
Example:
Project A starts on the 18.08.2023 and ends at the 25.08.2023. I assign person 1 and person 2 to the job.
Project B starts on the 21.08.2023 and ends at the 30.08.2023. I assign person 1 and person 3 to the job, which should not work, because person 1 is already “booked”.
The same if person 3 has planned a day off on the 29.03.2023.
Is this some how possible?
Thanks.