Product and BoM Prices

Good evening all.
Is there a fix for the prices of Bills of materials, to be passed up to final production products (for sale) yet.
I have a BoM, with also services as part of the BoM. The form adds up the cost of physical products (and subtracts stock etc as MO), but does not add up the costs of any added services.
These totals, are also not passed on to the final product for sale.
It does state (info balloon) that maybe module workstation will help, but its currently not available (Not to go on a production machine yet anyway)

Regards

tested on dolibarr V16 and V17.

2 Likes

Hi Rob, I’m curious if you found a fix for this. I’m also interested in the same outcome, and with the current version I can’t figure out how to automate it.

Hi,

with v21.0.1 the problem is still present. Services on a BOM don’t show any costs.

I think you need to file a bug report here @maxk, because the 2 existing bugs that are not the same but could be related are closed and on older versions.

for services the costs need to be entered here:

BUYING PRICES:

so they will be in the calculation of BOMs as well.

I have a buying price

Product is markes as “for sale” and “for purchase”.

I opened a bug report: In Bill of Material (BOM) service costs are not summed up · Issue #36591 · Dolibarr/dolibarr · GitHub

@Kim_KW1975 you’re right! I need a “Cost price”, too.
Now everything works.

Thank you!